1-hour TSP Monitoring Results |
|
|
|
|
|
|
|
Station
CM_AB1a, The Hong Kong Ice and Cold Storage (Aberdeen) |
|
|
|
|
|
|
Start |
Finish |
Weather |
TSP Concentration |
Action
Level |
Limit Level |
Site Conditions / |
Temperature |
Wind Speed |
Sampler |
Filter |
Date |
Time |
Time |
|
(µg/m3) |
(µg/m3) |
(µg/m3) |
Observations / Remarks |
(°C) |
(m/s) |
ID |
ID |
05-Jun-13 |
13:00 |
14:00 |
Cloudy |
51.2 |
282.5 |
500 |
Operatorion
of excavator and loading |
26.8 |
<5 |
LD-3B-001 |
N/A |
05-Jun-13 |
14:00 |
15:00 |
Cloudy |
55.0 |
282.5 |
500 |
Operatorion of excavator and loading |
26.8 |
<5 |
LD-3B-001 |
N/A |
05-Jun-13 |
15:00 |
16:00 |
Cloudy |
49.3 |
282.5 |
500 |
Operatorion of excavator and loading |
26.8 |
<5 |
LD-3B-001 |
N/A |
10-Jun-13 |
09:18 |
10:18 |
Cloudy |
100.5 |
282.5 |
500 |
Operatorion
of excavator and loading |
28.6 |
<5 |
LD-3B-001 |
N/A |
10-Jun-13 |
10:18 |
11:18 |
Cloudy |
96.7 |
282.5 |
500 |
Operatorion of excavator and loading |
28.6 |
<5 |
LD-3B-001 |
N/A |
10-Jun-13 |
11:18 |
12:18 |
Cloudy |
113.8 |
282.5 |
500 |
Operatorion of excavator and loading |
28.6 |
<5 |
LD-3B-001 |
N/A |
14-Jun-13 |
13:00 |
14:00 |
Cloudy |
104.3 |
282.5 |
500 |
Tunnel
works |
24.9 |
<5 |
LD-3B-001 |
N/A |
14-Jun-13 |
14:00 |
15:00 |
Cloudy |
58.8 |
282.5 |
500 |
Tunnel works |
24.9 |
<5 |
LD-3B-001 |
N/A |
14-Jun-13 |
15:00 |
16:00 |
Cloudy |
58.8 |
282.5 |
500 |
Tunnel works |
24.9 |
<5 |
LD-3B-001 |
N/A |
20-Jun-13 |
09:18 |
10:18 |
Sunny |
85.3 |
282.5 |
500 |
Preparing
blasting materials |
30.1 |
<5 |
LD-3B-001 |
N/A |
20-Jun-13 |
10:18 |
11:18 |
Sunny |
77.8 |
282.5 |
500 |
Preparing blasting materials |
30.1 |
<5 |
LD-3B-001 |
N/A |
20-Jun-13 |
11:18 |
12:18 |
Sunny |
81.5 |
282.5 |
500 |
Preparing blasting materials |
30.1 |
<5 |
LD-3B-001 |
N/A |
26-Jun-13 |
13:00 |
14:00 |
Sunny |
144.1 |
282.5 |
500 |
Tunnel
works |
29.7 |
<5 |
LD-3B-001 |
N/A |
26-Jun-13 |
14:00 |
15:00 |
Sunny |
185.9 |
282.5 |
500 |
Tunnel works |
29.7 |
<5 |
LD-3B-001 |
N/A |
26-Jun-13 |
15:00 |
16:00 |
Sunny |
218.1 |
282.5 |
500 |
Tunnel works |
29.7 |
<5 |
LD-3B-001 |
N/A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Min. |
49.3 |
|
|
|
|
|
|
|
|
|
|
Max. |
218.1 |
|
|
|
|
|
|
|
|
|
|
Average |
99 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|